Outlook Support

  • Subscribe to our RSS feed.
  • Twitter
  • StumbleUpon
  • Reddit
  • Facebook
  • Digg

Friday, 25 March 2011

Smart Metering – The Setup

Posted on 15:51 by Unknown

Some more buzz on smart metering........tried my hands with the aging MS Paint but gotta admit it still does come handy.....Well have my best work with paint inline along with some smart metering gyan…

Following diagram represents how a smart meter network is set-up and the actual infrastructure layout will be more or less similar to this set-up:


Here we have taken an example of a layout where power line communication (PLC) is used as the means of communication between the smart meter and the supplier infrastructure. The actual implementation of a smart meter program can adopt any modes of communication like GPRS, Broadband Lines etc. Let us now have a brief look at some of the components in the smart metering infrastructure:

i. Smart Meter Home

Every housing unit with an installed smart meter will be termed as a smart meter home. We will have a brief overview of the components in a smart meter home later in the document.

ii. Communication Centre

At the back of the smart metering infrastructure is a robust, scalable communication centre, also referred to as a head-end system, which supports two way communication i.e. data reception and data transmission. Design of such a communication center will be strategic as it has to ensure backward compatibility until the market transitions onto the new smart devices.

iii. Meter Data Management System (MDMS)

Apart from the conventional non-interval data, the MDMS has to be enabled to store interval consumption. MDMS also need to improve on the data integrity and privacy policies in wake of the huge amount of usage data been stored in the system.

iv. Stakeholders Data Access Only

Ease of data access is one of highest selling points of the smart metering program however authentication at all access points has to be ensured to ensure confidentiality and identification before allowing data exchange between authorized parties only.

v. Customer Experience

Using the existing cellular and broadband networks, suppliers can provide accurate and timely information to the customers enabling them to better manage their energy consumptio

Read More
Posted in | No comments

Wednesday, 23 March 2011

Radiating Testing Information - Part 1

Posted on 20:58 by Unknown
This topic is one that I have been asked about many times over the years and I am long overdue for a detailed discussion of it. Back in 2006 I presented an Experience Report at the STiFS workshop in New York titled "Low-Tech Testing Dashboard Revisited." The content of that presentation will be in Part 2. To quote "The Do-Re-Mi Song" from the movie The Sound of Music, "Let's start at the very beginning, a very good place to start."

I attended the StarEast conference in 1999 and there was a talk by James Bach titled "A Low Tech Testing Dashboard." This presentation clicked with me as I was managing several test teams at the time and it addressed a problem that I felt was important. I have used this communication tool many times ever since. If you are not familiar with it, I suggest you read through the PDF slides on the Satisfice web site before you continue. Go ahead. I'll wait.

In this review I will cover some of the who, what, where, when, how and why of the Low Tech Testing Dashboard (LTTD) through examples from past projects I have worked on. I expect your context is different, so my hope is that these examples may help you think about how you might apply this communication tool on your project.


Who are you? Whom is this for?

I have used this tool as a single tester on a development team, and as a team lead/manager managing multiple concurrent teams and projects - using one dashboard for each project.

The first time I used this dashboard, I was one of two testers working on a web application. We were both doing unscripted, risk-based Exploratory Testing and I needed a way to try and understand high-level testing progress since we had no other testing documents to use for reference. That is, it's hard to really understand what a tester means when they say they are "done" testing a feature and you have no way of really knowing if that means the same thing to both of you. Adopting the terminology and scales outlined in the LTTD presentation helped bring us together on the same page in describing progress.

The primary audience for this information was our test team. We stood around the board daily and used it to identify priorities and plans for the day. The secondary audience was the development and project team. Our team was located next to the kitchen so the Testing Dashboard was in a highly-visible location. As soon as we identified our first "BLOCKED" item on the board, the dashboard became a tool for the development team to identify the immediate priorities to unblock our testing. We explained what 'Blocked' meant the first time it happened and then Dev automatically resolved these issues every time after that without additional prompting. Cool!

I have used this board in Waterfall-type projects with a lot of scripted tests and documentation, and on Agile projects too. It is helpful for daily Scrum (stand-up) meetings as it can help you remember what you worked on, what you plan to do, and it identifies any blocking issues or risks that we need help with.

What is the LTTD?

The name has two parts: (1) Low Tech, and (2) Testing Dashboard.  They are both important. One describes how you communicate, and the other indicates what it is.

In Agile parlance, I have heard this dashboard referred to as an "information radiator." From the Agile Advice blog, "an information radiator is a large display of critical team information that is continuously updated and located in a spot where the team can see it constantly." One may argue that the entire Testing function/role/job purpose is to radiate (good) information. I agree with that perspective but will save that topic for discussion another day. Here I will focus on the outward presentation of particular information that communicates important project status and quality details to the project team.

The Testing Dashboard communicates different aspects or dimensions of the testing effort in a tabular format for everyone on the project team to see. The Low Tech part reminds you this information can and should be communicated using simple, readily available tools in a highly-visible area - such as a dry-erase board. You could make it high tech but you don't need to.  In fact, in my experience, for a single co-located development team (i.e. where the whole team is in the same room), anything more high tech than a dry-erase board is likely a waste of time.

The Testing Dashboard is novel because it communicates (i) Test Effort, (ii) Test Coverage, (iii) Quality Assessment, and (iv) current risks for each Product Area under test, all in one convenient location. It represents a snapshot of these dimensions for a given moment in time or for a particular build.  The use of smiley emoticons for the Quality Assessment is particularly effective. I have seen it happen several times where a developer will draw little devil horns on a red unhappy face. This is good because it shows their interest in interacting with the board and it is an expression of their feelings - in a humourous way. Fun interaction like this is always a good thing in my opinion.

Prior to using this dashboard, I was used to being asked for Test Coverage estimates (in terms of percentage tests complete and tests remaining) during Project Status Update meetings. This was likely a measure of the number of Test Plans, Test Cases, or Requirements covered using a Traceability Matrix of some kind. Those percentages always left me somewhat uneasy as I knew that precise measurements and estimates of such things don't reflect the reality of the remaining work to do.

What I like about the LTTD "Test Coverage" scale is that it was like going from Digital to Analog (i.e. a Physics/Electronics analogy). Suddenly I have this dial that I can use to more accurately describe the coverage! This is a good thing. In my opinion, precision in calculating remaining work to do is a waste of time. If humans are involved in the process, especially good testers, then your precise estimates will almost always be wrong. (NB: there is an important difference between accuracy and precision. It's great to have both but if I have to choose I'd rather be more accurate than precise.)

Where do you put the LTTD?

a low-tech testing dashboard in the hallway
As previously mentioned, an information radiator like this works best when it is in a highly-visible area. In one company, I placed the LTTD on a whiteboard next to the kitchen, which also happened to be on the way to the development area, so everyone in the company saw it sooner or later. In another company, we placed it on a rolling dry-erase board and positioned it at the entrance to the development area (see photo at right). Again, pretty hard to miss.

I've had mixed success with making the Dashboard high tech. At one company, I put a copy of the Testing Dashboard on the wiki. We used Atlassian Confluence at the time and it worked very well. Whenever we updated the dry-erase board during our regular morning stand-up meetings, I would take a few minutes to update the wiki version too. I started receiving comments from team leads in other departments thanking me for the information because they could now get testing updates without having to come up to our floor and see the board directly.

The nice thing about the wiki version was that we could create links to our test strategy pages, bug reports, and other helpful online information. It really does make a handy interactive Testing cover page or executive summary for each project!

This is a good time to mention another tester I know who has implemented a high tech version of the dashboard. Marlena Compton wrote about her experiences with the LTTD and posted it on her blog - see background and CAST 2010 presentation. I like what she's done with it.

Another time at a different company, I tried putting the Testing Dashboard on a wiki to help facilitate the communication for a test team that was distributed geographically. It didn't work very well. Okay, it didn't work at all. Unfortunately, the test team didn't use the wiki for testing purposes. I believe communication in general was a problem on this particular project, so the effort was probably doomed from the start. I haven't ruled out a wiki-based Testing Dashboard as a helpful tool for distributed teams, so I plan to try again when the opportunity presents itself.

When do you update the dashboard?

I create a fresh Testing Dashboard as soon as a project is kicked off. We add testing areas and features to the board as we hear about them and it is a good way to keep track of what is coming and when.

The original presentation suggests updates 2-5 times per week depending on your needs. That sounds about right. One time we were so involved in our testing that we only updated it once a week. This lasted for several weeks. We noticed that the dashboard was failing as a useful, timely communication tool so we returned to more frequent updates. I recommend nothing less than 2 updates per week.

If you are making noticeable testing progress then I would expect to update the board daily or maybe every other day. I find that it is a good place for the test team to gather around each morning and discuss what everyone is working on for the day. We can update it based on what we learned from the previous day, and it helps us to stay on top of the current priorities and risks as they come up.

If you are doing a dedicated Exploratory Testing (ET) effort (i.e. as opposed to ET accidentally happening between scripted test cases), then a tool like this may be useful in helping to communicate testing progress.  It's possible that you may already have other tools set up for tracking and communicating progress of your scripted or automated tests. I find that this dashboard communicates more than just progress through a count of tests, so I would still recommend it as a way to supplement your regular testing updates.

How do you build a Testing Dashboard?

Remember that the key here is to build something simple, easy to maintain, and gets the message across clearly. As in Real Estate, the 3 most important things are: location, location, location. Once you have that, then what? Well, it's really up to you, the tools you have available, and your imagination.

In the beginning, I found that drawing straight lines on white/dry-erase boards was a challenge. In the absence of a metre stick, I would grab whatever was handy and worked - e.g. the metal edge strip off a cubicle wall or even a pizza box. I found that the width of a whiteboard eraser is just right for horizontal line spacing. Then it's just a matter of filling in the table using the appropriate marker colours.

One annoyance was that every time we updated the board we would always have to re-draw the lines. By the end of the project the dashboard would look pretty ugly. The answer came at another company when I learnt that a developer had brought in painter's tape to make their agile board.

thin green painter's tape
In particular, he used Painter's Mate Green, 1/4 in x 60 yds or 6 mm x 55 m. It looks like this photo at right:

The 6 mm width is just about the same width as a board marker and the best part is that you can erase over it and the lines are always there! The green is also more visible than standard yellow masking tape on a whiteboard. I have seen blue painter's tape too, but I could never find one thin enough to use. Check your local hardware store to see what you have available.

So the tools I used to make the last few Testing Dashboards are: (1) 6 mm painters tape, (2) a post-it note (for spacing), and (3) colour markers.

I start by marking the width of the whiteboard eraser on a post-it note, and then use the post-it note as a guide for making the lines across the board (see photos below). Follow the general table outline as shown in the presentation slides and you will get the general idea.
creating a dashboard
close-up of how I space the lines without a ruler

A finished board looked like this a few weeks later:
a testing dashboard in use
I highly recommend using different-coloured markers when you create and update the dashboard. It makes the different meanings really stand out - i.e. it enhances how you communicate the message. For example, when you write "BLOCKED" in big red letters and have a red unhappy smiley face next to some show-stopper bug report number, people notice.

Why use the LTTD? Why not?

A good reason to use a tool like this is that it helps you and your test team to communicate important information to the project team without them having to ask you every time. In one sense, it does some work for you. For example, project managers can check the dashboard if they want an update and they don't have to interrupt you while you are testing. I don't know many tools that add time to my day. I am happy to say that this is one of them.

If your role as a tester is to provide valuable information, then radiate information! Let everyone know how things are going about things that are important to them before they even ask! Is there other information that people care about? Add it to the board!

The dashboard displays important info at a high level - a level that everyone on the project should understand. I have seen it happen many times when someone asks a tester how things are going and the tester gets lost in the details of the latest problem or issue that he or she encountered. The Testing Dashboard helps pull the tester up out of the details to put such events in a different perspective. Is that latest issue a blocking issue, or just another bug? Is it a show-stopper, or something that you require additional assistance from someone else on the team to help you investigate? What impact does this issue have on the overall quality of this feature or this release? How far along are we in testing this feature or all the features at this point?

The answers to these questions are always immediately visible on the dashboard. While we are fascinated by the puzzles and challenges of the testing problems we face every day, it's nice to have a dashboard around to remind us how to communicate at a level that our customers need.

So why wouldn't you want to use a board like this?

This question is partly rhetorical. I can think of at least one good reason why you might not want to.

For example, if the security policies of your organisation prevent you from leaving information like this up in a visible location. While making information visible is kind of the whole point of this dashboard, if your organisation won't allow it then you may wish to investigate other options - maybe even high-tech solutions. You have a team of smart people working with you. Get together and brainstorm a solution that works for you.

There may be other conditions or times when this may not be the right tool for you. "Because it hasn't been done before" is not a good reason to avoid it. If you are looking to grow, if you are looking for new ways to provide more value in innovative, simple and effective ways, you should give this a try. What will your Testing Dashboard look like? What will it say?

Radiate!



Here ends Part 1, an introduction to the Low-Tech Testing Dashboard. In Part 2, I will delve deeper into some of the aspects of the dashboard - how we modified it in different projects, and how we integrated it with Session-Based Test Management.

Before I post Part 2, I am interested to hear what you think. Have you tried using a Testing Dashboard like this before? Did it work for you? Are you thinking about trying it? Any other concerns that I haven't addressed yet? Please leave a comment and let me know what you think.

Cheers! Paul.
Read More
Posted in communication, information radiator, low tech testing dashboard, measuring progress, Software testing, testing dashboard | No comments

Monday, 21 March 2011

Ofgem's Doosra

Posted on 16:56 by Unknown

Monday morning gave the big news of Ofgem tightening the leash on the “Big Six” of the UK energy market. Their message was simple “Utilities charge more via complex bills”. Regulators are pro-consumer where they do not want the utility to transfer the costs immediately to the consumer and want them to transfer the benefits/ profits immediately. Of late what they have observed is exactly the opposite. A startling rise of 38% in the per consumer profit margin in a matter of two months does indicate a lot about transferring the costs. So what is Ofgem going to do about it? Simple simplify the bills to educate the consumer which does not mean immediate savings but savings via smart consumer choices. They are also looking at ending the dominance of the Big Six by mandating them to sell off 20% of their energy generation to allow newer entrants in the market. So yeah a very short leash indeed!

Please refer http://www.bbc.co.uk/news/business-12802591 for more information on Ofgem’s initiative.

Read More
Posted in | No comments

Sunday, 20 March 2011

Smart Metering - Distributor Beneits

Posted on 16:33 by Unknown

Am readying myself for the Monday blues and thinking how smart metering would benefit the less talked about player in the utility industry. Yeah! You guessed it right, its the distributors am thinking of. Well then lets see how a distributor can reap the benefits of the smart metering implementation. For distributors, the advantages are pretty much similar to the ones enjoyed by the supplier. However the flip side is it’s affect on the Customer’s Minutes Lost (CML) SLA. Whenever there is a fault in the distribution network the time of fault starts only when a member of public reports the incident. With smart meter the clock starts ticking the moment there is a fault in the network. Hence distributors need better infrastructure to leverage smart meters remote notification services. Let us also look at some of the distributor benefits:

(1) Based on the consumption data provided by Smart meters, Distributors are better positioned to manage and monitor the distribution network. Forecasting consumption levels to tailor the monitoring program would be a thing of past as real time usage levels will be available.

(2) Distributors can now accurately bill the suppliers and market participants for the usage of the distribution network thereby reducing losses and giving a tighter budget control

(3) Smart metering allows distributors to quickly identify and exactly position any faults in the system on power outages and interruptions. Smart meters also use tamper alerts which safeguards against distribution network power thefts.

Read More
Posted in | No comments
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Popular Posts

  • Enable ActiveX Control in Outlook
    Occasionally when using Microsoft Outlook, you may receive an error message telling you that your security settings do not allow ActiveX con...
  • Outlook requires Outlook Express 4.01
    Cannot start Microsoft Outlook. Outlook requires Microsoft Outlook Express 4.01 or greater. You can install Outlook Express by running Add/R...
  • Some incomplete thoughts...
    There are a series of related ideas that I want to discuss, but I don't think I'll have the time to properly describe them here. I...
  • Microsoft Outlook Duplicate Email Fix
    When using Microsoft Outlook, you may encounter an error in which all of your emails are downloaded twice. Depending on the size of your inb...
  • The Human Side of Living
    As I go through life I keep noticing stories, ideas and insights into humanity and I sometimes wonder if we are meant to discover these less...
  • Troubleshoot Outlook Express Error 0X800ccc90
    If you're an Outlook Express user trying to log on and you get an Error 0X800ccc90, which stops your password from being authenticated, ...
  • Happy Limerick Day! (May 12th)
    The CEO where I currently work sent around the following note by email at the start of today: Today is Limerick day. A limerick is a five-li...
  • Distorted Sound
    Another problem with MSN/Windows Live Messenger is the sound cuts out. This is a known problem with versions 7, 8.0, 8.1 Beta and 8.1. Usua...
  • Now with minty-fresh visitor counter
    Someone suggested to me this past weekend that I add a visitor counter to this blog. It's one of the most common suggestions made to me...
  • Windows live mail error Ox800CCCD2
    This error generally comes up when your firewall block any port. Reconfigure your account to Live Mail and also make sure that your firewal...

Categories

  • agile
  • agile testing
  • AYE
  • bad training
  • bugs
  • building software
  • certification
  • communication
  • conference
  • configure outlook express
  • configure windows live hotmail account in windows live mail
  • configure windows live mail
  • context-driven
  • development
  • engineering
  • error message
  • ET
  • exploratory testing
  • future
  • hiring
  • hobbies
  • hotmail account validation process
  • How to Enable ActiveX Control in Outlook
  • how to fix duplicate email
  • how to solve error 4.01 or greater
  • incoming mail sync to outlook
  • information radiator
  • instruction for pst file
  • interests
  • lean
  • lean software development
  • learning
  • low tech testing dashboard
  • management
  • mastery
  • measuring progress
  • metrics
  • Microsoft Outlook Duplicate Email Fix
  • Microsoft Technical Support
  • Microsoft Windows Mail
  • ms outlook duplicate email
  • msn account reset
  • msn account validation process
  • msn error code 0x80004005
  • msn error code 0x80004005 in apple mac
  • msn error code 0x80004005 windows 8
  • MSN Error Support Msn Help and Support
  • MSN Password Recovery
  • msn password reset
  • MSN Technical Support
  • outgoing mail not sent from outlook express
  • outlook not authenticate password
  • passion
  • people
  • pop3 email server
  • programming
  • quality
  • Quality Center
  • questions
  • regression testing
  • remove error 0X800ccc90
  • remove Error 0X800ccc90/Error 0x800ccc18
  • remove error 421
  • remove error ox800ccc90
  • remove msn error code 0x80004005 in windows 7
  • remove windows live mail
  • repair microsoft outlook pst file
  • repair PST file
  • resolve sound distortion problem with your live messenger
  • reviewing resumes
  • Satir
  • SBTM
  • science
  • skills
  • software
  • software testers
  • Software testing
  • sound distortion msn
  • sound distortion with livemail
  • support for microsoft outlook
  • support for outlook
  • TDD
  • technical support for microsoft outlook
  • testing
  • testing dashboard
  • time
  • Unable To Login in Windows Mail
  • unable to loging in waindows mail
  • value
  • Waterfall
  • windows live mail error Ox800CCCD2
  • windows live mail support
  • writing

Blog Archive

  • ►  2013 (16)
    • ►  September (10)
    • ►  August (1)
    • ►  April (1)
    • ►  February (2)
    • ►  January (2)
  • ►  2012 (3)
    • ►  May (1)
    • ►  February (1)
    • ►  January (1)
  • ▼  2011 (25)
    • ►  December (1)
    • ►  October (1)
    • ►  September (2)
    • ►  August (3)
    • ►  July (2)
    • ►  May (1)
    • ►  April (2)
    • ▼  March (9)
      • Smart Metering – The Setup
      • Radiating Testing Information - Part 1
      • Ofgem's Doosra
      • Smart Metering - Distributor Beneits
      • Smart Metering - Supplier Benefits
      • Customer Service - Essence
      • Smart Metering - Consumer Benefits
      • Smart Metering - The Confusion
      • Smart Metering – The Rationale
    • ►  February (2)
    • ►  January (2)
  • ►  2010 (13)
    • ►  November (1)
    • ►  September (3)
    • ►  July (1)
    • ►  May (1)
    • ►  April (1)
    • ►  February (4)
    • ►  January (2)
  • ►  2009 (10)
    • ►  December (1)
    • ►  November (2)
    • ►  October (2)
    • ►  July (3)
    • ►  May (1)
    • ►  February (1)
  • ►  2008 (4)
    • ►  October (1)
    • ►  April (1)
    • ►  March (2)
  • ►  2007 (12)
    • ►  November (1)
    • ►  August (2)
    • ►  July (1)
    • ►  May (3)
    • ►  February (2)
    • ►  January (3)
  • ►  2006 (1)
    • ►  August (1)
  • ►  2005 (16)
    • ►  November (2)
    • ►  October (1)
    • ►  September (2)
    • ►  August (1)
    • ►  May (4)
    • ►  April (4)
    • ►  February (1)
    • ►  January (1)
  • ►  2004 (2)
    • ►  December (2)
Powered by Blogger.

About Me

Unknown
View my complete profile